Corona index measures no fever

Things are now largely back to normal on German construction sites. Good two thirds (67%) of the companies see no restrictions whatsoever on the material and staffing situation on their construction sites. In the previous week, this figure was still 43 %. The proportion of those with slight shortages fell from 57 to 33 %. There are no longer any complaints about severe problems or even standstill as in the first weeks after the corona lockdown. Accordingly, the so-called fever curve of the index fell to 36.8 degrees, i.e. almost normal temperature. The curve ranges from 36.5 degrees (no restrictions) to 41.5 degrees (complete construction stop). The construction monitoring network includes the project managers Emproc SYS and Cushman & Wakefield.

Source: THOMAS DAILY